Home / Output 1
OUTPUT 1 — $15.77M · INFRASTRUCTURE PILLAR
Health Services in Selected Border Areas Strengthened
BAHP's largest investment pillar upgrades physical health infrastructure across Champasak, Phongsali, and Savannakhet — delivering 5 new hospitals, modern medical equipment, and rigorous technical oversight through three coordinated sub-components.
5
Hospitals
Across 3 provinces
$15.77M
Output 1 Investment
Infrastructure pillar
3
Target Provinces
Champasak, Phongsali, Savannakhet
Q3 2028
Target Operations
Hospitals commence services
THREE SUB-COMPONENTS
What Output 1 Delivers
Output 1 finances the detailed engineering design and construction of 5 new hospitals across Champasak, Phongsali, and Savannakhet, delivered through three coordinated sub-components.
OUTPUT 1.1
Health Facility Construction & Design
Detailed engineering design and construction of 5 new hospitals across Champasak, Phongsali, and Savannakhet, built to national health facility standards.
OUTPUT 1.2
Medical Equipment & Essential Supplies
Deployment of modern medical equipment to all 5 hospitals, guided by a 5-year costed Equipment Master Plan and funded by the $20M ADB OCR Concessional Loan.
OUTPUT 1.3
Facility Design Documents & Construction Supervision
Facility Design Documents for all 5 hospitals and a dedicated Detailed Design & Construction Supervision (DDCS) firm ensuring quality construction throughout.
